Lock-up inspection in Beveridge

Lock-up is the last look at a Beveridge frame, roof and services before insulation and plaster close the walls.

  • Roof, windows and external doors in, before insulation and plaster
  • 1 to 2 hours on site
  • Report within 24 hours
Price your inspectionTell us the stage or service and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage4 of 7
When to bookRoof, windows and external doors in, before insulation and plaster
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Beveridge lock-up (pre-plaster) inspection

  • Wall wrap and roof sarking coverage, laps and tears
  • Head, sill and jamb flashings to every window and door
  • Weep holes clear and correctly spaced
  • Articulation joints and cavity clearance
  • Mortar joints, brick ties and bed joint reinforcement
  • Lintels over openings and their bearing
  • Roof battens, tile or sheet fixing and ridge details
  • Valleys, penetrations and box gutter supports
  • Roof space insulation, sarking and services
  • Exhaust and rangehood ducting runs
  • External cladding fixing and clearance to ground
  • Garage, porch and alfresco set-downs
  • Site drainage and grading before landscaping
  • Debris and mortar droppings at the slab edge
Why it matters here

Lock-up (pre-plaster) inspections on Beveridge builds

At lock-up in Beveridge we have found bracing cut after it passed at frame, ducts crimped through tight bends in the roof, sarking sagging past its limit and termite protection breached at the wall base. On one job every frame item from the earlier report was still open.

What we find at this stage in Beveridge

  • Wall bracing cut by a following trade
  • Ducts crimped in the roof space
  • Sarking sagging more than 40mm
  • Termite protection breached
  • Roof penetrations left unsealed
  • Frame items from the earlier report still not fixed
Gap left unsealed around a roof penetration, a direct path for rain, found during a lock-up inspection in Beveridge
Gap left unsealed around a roof penetration, a direct path for rain
Roof cladding unfinished at lock-up, with plaster about to go in below, found during a lock-up inspection in Beveridge
Roof cladding unfinished at lock-up, with plaster about to go in below
Weep holes finished at the brick face, where render will close them over, found during a lock-up inspection in Beveridge
Weep holes finished at the brick face, where render will close them over
Sarking left long where it runs past the edge of the roof cladding, found during a lock-up inspection in Beveridge
Sarking left long where it runs past the edge of the roof cladding
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Beveridge

Annotated findings from Lock-up (pre-plaster) inspections.

Wall bracing cut through after the frame stage, losing its lateral strength, found during a lock-up inspection in Beveridge
Wall bracing cut through after the frame stage, losing its lateral strength
Heating ducts crimped through tight bends in the roof space, choking the airflow, found during a lock-up inspection in Beveridge
Heating ducts crimped through tight bends in the roof space, choking the airflow
Sarking sagging past the 40mm allowance, so water can pond and drip, found during a lock-up inspection in Beveridge
Sarking sagging past the 40mm allowance, so water can pond and drip
Termite protection breached at the base of the external wall, found during a lock-up inspection in Beveridge
Termite protection breached at the base of the external wall

The other stages of a Beveridge build

  1. Bored piers inspection in Beveridge1Bored piersOnce the holes are bored and cages set, before any concrete
  2. Slab pre-pour inspection in Beveridge2Slab pre-pourWith steel tied and pods placed, the day before concrete
  3. Frame inspection in Beveridge3FrameFrame standing and trusses on, before wrap and sarking
  4. Fixing inspection in Beveridge5FixingCabinetry, doors and trims fitted, painters not yet started
  5. Waterproofing inspection in Beveridge6WaterproofingMembrane on and cured, tiles not yet laid
  6. Pre-handover (PCI) inspection in Beveridge7Pre-handover (PCI)Roughly a week before the builder hands over

All construction stage inspections in Beveridge →

Guides

Construction stage guides for Beveridge

All guides →

Book a lock-up (pre-plaster) inspection in Beveridge

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Beveridge: common questions

How does bracing get cut after frame?

A plumber or electrician needs a path and goes through it. The brace passed at frame and is broken a week later.

Why look at ducts at lock-up?

The ducts are in and easy to see. Crimped or tight bends restrict airflow to rooms, and once insulation goes over them they are hard to reach.

What happens to frame defects that were not fixed?

We list them again as carried forward, with photos, so you can ask the builder for proof before plaster.

Is a breached termite barrier serious?

It defeats the protection the house was given. We record it so the installer can reinstate it before walls are lined.

Do you check windows at lock-up?

Installation and flashing where visible, plus the frames around them. Operation and finishing come at fixing and handover.

Can I visit the site with you?

Yes, if the builder agrees to your attendance. We will point out each item as we go.