Fixing inspection in Beveridge

Fixing is when a Beveridge house starts to look finished, and when what was built can be compared with the plans room by room.

  • Cabinetry, doors and trims fitted, painters not yet started
  • 1 to 2 hours on site
  • Report within 24 hours
Price your inspectionTell us the stage or service and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage5 of 7
When to bookCabinetry, doors and trims fitted, painters not yet started
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the VBA Guide to Standards and Tolerances 2015 and your contract selections

What is included in a Beveridge fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Beveridge builds

Beveridge fixing visits have turned up a butler's pantry window at the wrong height, a stormwater pipe missing from where the drawings put it, rainheads without overflows, render over control joints and Category 3 cracking in the brickwork.

What we find at this stage in Beveridge

  • Window installed at the wrong height
  • Stormwater pipe missing where drawn
  • Rainhead without an overflow hole
  • Render covering control joints
  • Moderate brickwork cracking
Render run straight over the control joints, so the cracks will follow, found during a fixing inspection in Beveridge
Render run straight over the control joints, so the cracks will follow
Rainhead fitted without an overflow hole, so heavy rain can back up inside, found during a fixing inspection in Beveridge
Rainhead fitted without an overflow hole, so heavy rain can back up inside
Window sealing and flashing left unfinished around the frame, found during a fixing inspection in Beveridge
Window sealing and flashing left unfinished around the frame
Roof tile lines running wavy across the roof plane, found during a fixing inspection in Beveridge
Roof tile lines running wavy across the roof plane
Sample findings

Sample defects found during our fixing inspections in Beveridge

Annotated findings from Fixing inspections.

Butler's pantry window fitted at the wrong height for the bench below, found during a fixing inspection in Beveridge
Butler's pantry window fitted at the wrong height for the bench below
Stormwater pipe missing where the drawings show a connection, found during a fixing inspection in Beveridge
Stormwater pipe missing where the drawings show a connection
Broken roof tiles still in place at fixing, a leak waiting for rain, found during a fixing inspection in Beveridge
Broken roof tiles still in place at fixing, a leak waiting for rain
Moderate brickwork cracking recorded at Category 3, well past a cosmetic crack, found during a fixing inspection in Beveridge
Moderate brickwork cracking recorded at Category 3, well past a cosmetic crack

The other stages of a Beveridge build

  1. Bored piers inspection in Beveridge1Bored piersOnce the holes are bored and cages set, before any concrete
  2. Slab pre-pour inspection in Beveridge2Slab pre-pourWith steel tied and pods placed, the day before concrete
  3. Frame inspection in Beveridge3FrameFrame standing and trusses on, before wrap and sarking
  4. Lock-up (pre-plaster) inspection in Beveridge4Lock-up (pre-plaster)Roof, windows and external doors in, before insulation and plaster
  5. Waterproofing inspection in Beveridge6WaterproofingMembrane on and cured, tiles not yet laid
  6. Pre-handover (PCI) inspection in Beveridge7Pre-handover (PCI)Roughly a week before the builder hands over

All construction stage inspections in Beveridge →

Guides

Construction stage guides for Beveridge

All guides →

Book a fixing inspection in Beveridge

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Beveridge: common questions

Why check stormwater at fixing?

Pipes are still exposed at the house before landscaping. A missing or broken connection means roof water dumped at the slab.

What is a rainhead overflow?

An opening in the rainhead face so heavy rain spills outside the building rather than backing up into the box gutter or roof.

Why does render over a control joint matter?

The joint is there to absorb movement. Rendered over, it cracks along the line it was meant to protect.

Are doors and joinery part of the fixing visit?

Yes, by hand: hanging, gaps, plumb and fixing.

Which standards apply?

Your plans and selections, the Guide to Standards and Tolerances 2015 and the NCC.

Is fixing too late to find structural issues?

It is late for framing, but brickwork cracking and floor levels are still visible and worth recording now.